For teams and coaches whose expertise deserves real structure.

Underprop Solutions is a learning design studio and fractional L&D consultancy that stays with you from the first design through the work of making it run.

THE PROBLEM

Where does this sound like you?

Team Leader

If you're running a team.

  • No clear onboarding — new hires figure it out alone

  • Training is scattered, outdated, or inconsistent

  • Success depends on specific people, not process

  • Growth is outpacing quality

Coach

If you're a coach or educator

  • Deep expertise, no structure to teach it in

  • Content lives in your head, not a repeatable system

  • Delivering everything 1:1 is capping your growth

  • You want a course or community, but not sure how to build it

A woman with brown hair, wearing a black shirt, is sitting at a wooden desk, writing on paper with a pen. In front of her, there is a silver laptop, and nearby are sticky notes and papers on the desk. She is smiling and appears to be in a modern office setting with dark walls and glass partitions.
A woman with brown hair, wearing a black shirt, is sitting at a wooden desk, writing on paper with a pen. In front of her, there is a silver laptop, and nearby are sticky notes and papers on the desk. She is smiling and appears to be in a modern office setting with dark walls and glass partitions.

HOW I WORK

The Underprop difference

Most consultants hand you a recommendation. Most designers build exactly what's scoped, then disappear. I stay through both, looking at the same five things on every project — people, content, timing, systems, standards — from the first diagnosis to the system that's actually running.

Start wherever you are. Need a build? I design. Need direction first? I strategize. Either way, it's one partner, start to finish.

THE WORK

Project snapshots

YOUR OPTIONS

Ways to work together

PACKAGES

Design


Design what you need.

Foundations or Bespoke to strengthen what exists, or build something new from scratch.

PACKAGES

Partner


Support what you've already got.

Fractional L&D partnership, whether it's a system we built together or one that's already yours.

A woman with long, light brown hair wearing a black top, smiling and standing against a gray wall.

MEET THE FOUNDER

Hi, I’m Amra.

I built my career in corporate learning and development, where intentional, well-designed training systems were simply part of how things worked.

Smaller organizations deserve that same level of support. Most just don't have access to it yet, not because the need isn't there, but because the resources and expertise often aren't.

That's why I founded Underprop. To bring that same quality of learning design and systems thinking to the teams and organizations that need it most.

Insights

Thoughts on learning, culture, and the human side of building organizations, based on what I'm seeing in the work I do every day.


Not sure where to start?

Let's talk through what you've got and figure out the right path. Prefer to send a note instead? Fill out a form.